SWPPP Preparation & Management
A SWPPP built for your site, not a template with your address on it.
If your project disturbs an acre or more, TCEQ requires a Stormwater Pollution Prevention Plan before ground breaks — a site-specific plan covering your controls, your drainage, your sequencing, and your receiving waters.
GroundMark prepares SWPPPs from your civil plans, built to the TXR150000 permit and to what your city actually requires — because municipal stormwater programs in this corridor differ, and a plan that satisfies TCEQ can still catch a comment from the city.
And a SWPPP isn't a document you file and forget. Site conditions change: phasing shifts, controls move, contractors turn over. The permit requires the plan to keep up. We manage the SWPPP through the life of the project — amendments, updated maps, current contact info, complete records — so the binder in the trailer matches the site outside the door.